Jump directly to page content

Work completed on another oil cavern in the South Field to improve well integrity

Winch used for the removal and installation of pipes in the borehole of the cavernOpens image in new tab

Winch used for the removal and installation of pipes in the borehole of the cavern

Workover operations started in February 2022 to install a control annulus on another oil cavern in the south field of the Etzel cavern facility to improve well integrity were completed on schedule last week.

After completion of remaining work, the cavern will be returned to regular storage operations. STORAG ETZEL would like to expressly thank the neighbors in the area of the street "Hohejohlster Straße" in Etzel for their understanding during the work, which was carried out on the cavern site there in 24-hour operation / 7 days a week.

Plans are in place to improve well integrity in this manner on additional oil caverns in 2022. STORAG ETZEL's ongoing re-completion program for the oil and gas caverns at the Etzel site includes investments of around 51 million euros for 2021 and 2022 alone.